Operations

Surface equipment for Gravel Pack operation

  • Workover rig
  • Twin Cement-pump unit
  • Gravel Pack Batch mixerž
  • Surface fluid filter

Equipment for Gravel Pack operation

  •   Screens
  •   Sealing tool
  •   Universal conector
  •   Packer with W-ruber
  •   Wash pipes
  •   Propant for Gravel Pack
  •   Fluid aditives
  •   Production Packer

Screens (single & prepack)

 

Reference

  • over than 500 Gravel packing operation on oil & gas wells

Oil Well

  • First Well (1982.) Oil field VELEBIT

Gas well

  •  First Well  (1987.) Gas Storage – Banatski Dvor
In order to provide a better user experience, this page uses cookies. Cookie usage I agree